header
 
Home | Care and Maintenance
     
How long before I can walk on it?   Answer: Next day
     
How long before I can place things on the coated surface?   Answer:

1. Next day for light weight furniture and items (don’t sit on furniture)
2. Three (3) days to sit on furniture
3. Seven (7) days for heavy steel or concrete items

     
How long before rinsing everything off or turning on my sprinklers?   Answer: Next day
     
How do I clean it?   Answer:

a. Rinse off regularly and sweep
b. Use Simple Green or a natural citrus cleaner and a broom on difficult areas to clean
c. Small hard to clean areas use a Mr. Clean Magic Eraser

     
How do I clean grease or oil spots?   Answer: Use Dawn dish soap and water
     
Side Notes:   * Do not use rubber welcome mats or rubber compound chair and table leg feet. (This can mark the surface)

* All potted plants must have a tray under them. (The oxides and minerals in some pots and soil can cause discoloration.)

 
 

Email: info@azcreativesurfaces.com | Phone: 480.545.1154 | Fax: 480.545.1164

License No. ROC 239634, Bonded, Insured


©2008 Arizona Creative Surfaces

home page Coatings eco friendly concrete staining